Set HomePage Add Favorite    
Chinese English    
Company News
Production Unit
You're at: Home >> Production and Equipment >> Production Unit
1.2 mt/y Delayed Coking Plant
Automatic rolling screen Author : 网站管理员 Add Date : 2012/12/18 Hits : 3118 【Font : 16 14 12

 With a processing capacity of 1.2 mt/y our delayed coking plant is designed by Cooec-Enpal Engineering Co., Ltd; with a layout of one furnace and two towers, the plant adopts a technical proposal of producing more diesel oil and less wax oil.
 Main products: gasoline, diesel oil, wax oil, coked dry gas, liquefied petroleum gas and petroleum coke.

     

     

 
 

Print || Close Windows
© 2021 Sichuan Shengma Chemical Industry Stock Co., Ltd All rights reserved by www.scshengma.com
Address: Industrial Park, Daying, Suining,Sichuan Phone: 0825-7880260 Fax: 0825-7880386 Maket Dpt.: 0825-7880272