设为首页 加入收藏    
Company News
Production Unit
您的位置:首页 >> >> Production Unit
1.2 mt/y Delayed Coking Plant
双击自动滚屏 发布时间:2012/12/18 11:03:25 阅读:2877次 【字体:

 With a processing capacity of 1.2 mt/y our delayed coking plant is designed by Cooec-Enpal Engineering Co., Ltd; with a layout of one furnace and two towers, the plant adopts a technical proposal of producing more diesel oil and less wax oil.
 Main products: gasoline, diesel oil, wax oil, coked dry gas, liquefied petroleum gas and petroleum coke.

     

     

 
 

返回目录 || 打印本页 || 关闭窗口
版权所有 © 2021 四川盛马化工股份有限公司 All rights reserved by www.scshengma.com
地址:四川省遂宁市大英县工业集中发展区 技术支持:亿速科技
备案号:蜀ICP备19027865号-1 遂公网安备51092302000004

川公网安备 51092302000211号